The article proposes a practical framework of metrics for EPC projects, where the term, cost and quality are linked to real objects of work. “Earned value” is calculated by physical volumes, not by acts, procurement is assessed as “readiness for installation”, design — by the maturity of documentation and the speed of closing requests for clarification. The schedule is maintained by a probabilistic corridor, which allows for careful use of reserves. Quality is translated into the “cost of non-conformity”, so defects become visible in money and time. The change loop works like a funnel: from a trend to a formalized decision with an assessment of the impact on the critical path and margin. Such a system of metrics transfers EPC from post-factum reporting to predictive management, reduces rework and “empty” deliveries, reduces cash gaps and stabilizes the project margin without emergency scenarios.
EPC, earned value, SPI, CPI, installation readiness, documentation maturity, cost of non-conformance, probability planning, RFI, change management
1. Bocharov, M. E. Informacionnoe modelirovanie i tehnologii upravleniya proektami - put' k interoperabel'nosti upravleniya dannymi / M. E. Bocharov // Informacionnoe modelirovanie v zadachah stroitel'stva i arhitektury : Materialy VII Mezhdunarodnoy nauchno-prakticheskoy konferencii, Sankt-Peterburg, 15–17 maya 2024 goda. – Sankt-Peterburg: Sankt-Peterburgskiy gosudarstvennyy arhitekturno-stroitel'nyy universitet, 2024. – S. 58-65
2. Il'in, I. V. Modelirovanie biznes-arhitektury processnoi proektno-orientirovannogo predpriyatiya / I. V. Il'in, A. I. Levina, A. R. Antipin // Ekonomika i upravlenie. – 2013. – № 9(95). – S. 32-38
3. Lapidus, A. A. Informacionnoe modelirovanie zdaniy kak faktor riska proekta / A. A. Lapidus, O. D. Chapidze, V. S. Ratomskaya // Stroitel'noe proizvodstvo. – 2023. – № 3. – S. 80-87
4. BIM compatibility and interoperability challenges in the construction industry: a critical review of an overlooked innovation factor / S. Shirowzhan, S. M. E. Sepasgozar, D. J. Edwards, H. Li, B. Zhong, C. Wang. //Automation in Construction. - 2020.-Vol. 112, Iss. 103086
5. Elhendawi, A. Methodology for BIM implementation in the Kingdom of Saudi Arabia / A. Elhendawi,A.Smith,E. Elbeltagi. // International Journal of BIM and Engineering Science. - 2019. - Vol. 2, Iss. 1. - P. 1-20
6. Kolesnikov, D. A. Otlichitel'nyy podhod k formirovaniyu ceny u zastroyschika-genpodryadchika i zastroyschika-developera / D. A. Kolesnikov // Innovacii. Nauka. Obrazovanie. – 2021. – № 28. – S. 101-108
7. Kallaur, G. Yu. Berezhlivoe proizvodstvo kak instrument Agile v stroitel'noy otrasli / G. Yu. Kallaur, A. Yu. Ust'yanceva, O. A. Fedorova // Gibkie tehnologii proektnogo upravleniya v cifrovoy srede : Materialy studencheskogo kruglogo stola v ramkah HII Mezhdunarodnoy nauchno-prakticheskoy konferencii, posvyaschennoy 115-letiyu REU im. G.V. Plehanova, Moskva, 08 aprelya 2022 goda / Pod redakciey V.I. Resina. – Moskva: Rossiyskiy ekonomicheskiy universitet imeni G.V. Plehanova, 2022. – S. 49-55
8. Olugboyega, O. Model for creating cloud-BIM environment in aec firms: a grounded theory approach / O. Olugboyega, E. D. Omopariola, O. J. Ilori. // American Journal of Civil Engineering and Architecture. -2019.-Vol. 7, № 3,- P. 146-151