student
The article shows how BIM (building information modeling) is becoming a source of capital expenditure (CAPEX) savings for general contractors and developers. Linking the model with deadlines and estimates (4D/5D) transforms decisions from “pictures” into manageable money: volumes and specifications are calculated more accurately, collisions are identified earlier, the schedule is leveled and rework is reduced. Based on three completed projects, it is demonstrated that the effect appears where the model is the primary source of the estimate, calendar and procurement lots, and the processes are based on formalized requirements for the model (EIR), its maintenance plan (BEP) and the common data environment. Special attention is paid to contract customization (GMP, avoided cost section), prefabrication and “BIM-to-field”. The limits of applicability are shown: without attributes, integration with estimating/ERP systems and change discipline, savings quickly dissolve in unforeseen expenses.
BIM, information modeling, CAPEX, 4D/5D planning, general contractor, developer, costing discipline, procurement, common data environment (CDE), GMP, avoided costs
1. Elhendawi, A. Methodology for BIM implementation in the Kingdom of Saudi Arabia / A. Elhendawi,A.Smith,E. Elbeltagi. // International Journal of BIM and Engineering Science. - 2019. - Vol. 2, Iss. 1. - P. 1-20
2. Kolesnikov, D. A. Otlichitel'nyy podhod k formirovaniyu ceny u zastroyschika-genpodryadchika i zastroyschika-developera / D. A. Kolesnikov // Innovacii. Nauka. Obrazovanie. – 2021. – № 28. – S. 101-108
3. Kallaur, G. Yu. Berezhlivoe proizvodstvo kak instrument Agile v stroitel'noy otrasli / G. Yu. Kallaur, A. Yu. Ust'yanceva, O. A. Fedorova // Gibkie tehnologii proektnogo upravleniya v cifrovoy srede : Materialy studencheskogo kruglogo stola v ramkah HII Mezhdunarodnoy nauchno-prakticheskoy konferencii, posvyaschennoy 115-letiyu REU im. G.V. Plehanova, Moskva, 08 aprelya 2022 goda / Pod redakciey V.I. Resina. – Moskva: Rossiyskiy ekonomicheskiy universitet imeni G.V. Plehanova, 2022. – S. 49-55
4. Olugboyega, O. Model for creating cloud-BIM environment in aec firms: a grounded theory approach / O. Olugboyega, E. D. Omopariola, O. J. Ilori. // American Journal of Civil Engineering and Architecture. -2019.-Vol. 7, № 3,- P. 146-151
5. Bocharov, M. E. Informacionnoe modelirovanie i tehnologii upravleniya proektami - put' k interoperabel'nosti upravleniya dannymi / M. E. Bocharov // Informacionnoe modelirovanie v zadachah stroitel'stva i arhitektury : Materialy VII Mezhdunarodnoy nauchno-prakticheskoy konferencii, Sankt-Peterburg, 15–17 maya 2024 goda. – Sankt-Peterburg: Sankt-Peterburgskiy gosudarstvennyy arhitekturno-stroitel'nyy universitet, 2024. – S. 58-65
6. Il'in, I. V. Modelirovanie biznes-arhitektury processnoi proektno-orientirovannogo predpriyatiya / I. V. Il'in, A. I. Levina, A. R. Antipin // Ekonomika i upravlenie. – 2013. – № 9(95). – S. 32-38
7. Lapidus, A. A. Informacionnoe modelirovanie zdaniy kak faktor riska proekta / A. A. Lapidus, O. D. Chapidze, V. S. Ratomskaya // Stroitel'noe proizvodstvo. – 2023. – № 3. – S. 80-87
8. BIM compatibility and interoperability challenges in the construction industry: a critical review of an overlooked innovation factor / S. Shirowzhan, S. M. E. Sepasgozar, D. J. Edwards, H. Li, B. Zhong, C. Wang. //Automation in Construction. - 2020.-Vol. 112, Iss. 103086