This article addresses the pressing scientific and practical challenge of ensuring the accuracy of cost estimates in the early stages of investment and construction projects, when detailed design solutions are lacking. A critical analysis of the current cost estimate system is provided, identifying its systemic shortcomings, including regulatory inertia, regional variability in construction conditions, the impact of market volatility, and the subjective human factor. As a methodological solution, a proprietary methodology for generating aggregate cost estimates is proposed, based on a synthesis of the principles of hierarchical decomposition of an object and progressive packaging of works. The methodology was tested using the example of calculating the cost of constructing a multi-layer external wall using current state elemental cost estimate standards and a federal collection of cost estimates. The results of the test demonstrate the practical validity of the approach: the discrepancy with the results of a detailed traditional calculation was 13.25%, which is within the acceptable accuracy standard for the pre-design stage. In conclusion, the potential for implementing the methodology is substantiated and promising areas for further research are identified, the key one being the integration of the developed approach with building information modeling (BIM) technology to automate costing processes.
investment and construction project, estimated cost, pre-project stage, consolidated estimate, progressive packaging of works, hierarchical decomposition, estimation accuracy
1. Voropaev V. I., Sekletova G. I. Sistemnoe predstavlenie upravleniya proektami. — http://www.sovnet.ru, 2002.
2. P.V. Goryachkin Izmeneniya v sfere cenoobrazovaniya i kontraktnyh otnosheniy v stroitel'stve. Praktika primeneniya novyh dokumentov Mezhregional'naya obschestvennaya organizaciya po sodeystviyu razvitiyu stroitel'noy otrasli Soyuz inzhenerov-smetchikov, 2023
3. GOST R 21.101-2020 Sistema proektnoy dokumentacii dlya stroitel'stva. Osnovnye trebovaniya k proektnoy i rabochey dokumentacii. - [Elektronnyy resurs] // Rezhim dostupa https://nav.tn.ru/cloud/iblock/3e9/3e93c93362a880b86b367a5f0eaf5263/GOST-R-21.101_2020-Natsionalnyy-standart-Rossiyskoy-Federatsii.-Sistema-proektirvoaniya-dlya-stroitelstva.-Osnovnye-trebovaniya-k-proektnoy-i-raboch.pdf (data obrascheniya 23.05.2025)
4. Mazur I. I., Shapiro V. D. i dr. Upravlenie proektami. Spravochnoe posobie. — M.: Vysshaya shkola, 2001.
5. N'yuell M. Upravlenie stoimost'yu proekta // Direktor IS. — 2002. — №7–8.
6. Postanovlenie Pravitel'stva RF ot 16.02.2008 № 87 (v redakcii ot 28.12.2024) O sostave razdelov proektnoy dokumentacii i trebovaniyah k ih soderzhaniyu - [Elektronnyy resurs] // Rezhim dostupa https://normativ.kontur.ru/document?moduleId=1&documentId=486098 (data obrascheniya 23.05.2025)
7. Prikaz ot 4 avgusta 2020 g. n 421/pr Ministerstva stroitel'stva i zhilischno-kommunal'nogo hozyaystva Rossiyskoy Federacii «Ob utverzhdenii metodiki opredeleniya smetnoy stoimosti stroitel'stva, rekonstrukcii, kapital'nogo remonta, snosa ob'ektov kapital'nogo stroitel'stva, rabot po sohraneniyu ob'ektov kul'turnogo naslediya (pamyatnikov istorii i kul'tury) narodov Rossiyskoy Federacii na territorii Rossiyskoy Federacii» (v red. prikazov Minstroya RF ot 07.07.2022 n 557/pr, ot 30.01.2024 n 55/pr, ot 23.01.2025 n 30/pr) - [Elektronnyy resurs] // Rezhim dostupa https://normativ.kontur.ru/document?moduleId=1&documentId=491214 (data obrascheniya 23.05.2025)
8. Subbotin A. Trudozatraty i stoimost'. — http://www.sovnet.ru, 2003.
9. Federal'naya smetnaya normativnaya baza FSNB-2022, utverzhdennaya prikazom Minstroya Rossii ot 30 dekabrya 2021 g. № 1046/pr - [Elektronnyy resurs] // Rezhim dostupa https://www.minstroyrf.gov.ru/trades/tsenoobrazovanie/federalnaya-smetnaya-normativnaya-baza-fsnb-2022-utverzhdennaya-prikazom-minstroya-rossii-ot-30-dekabrya-2021-g-1046-pr/ (data obrascheniya 23.05.2025)